![]() |
1958 Cast iron powerglide linkage adjustment?
i have a 2 speed P/G tranny ,, with 235 motor ,, the only adjustment for shifts are at the tranny ,i just dont know how to do it ,, i need to make it shift just a tad sooner ,i can make it shift by feathering the gas pedal ,, any ideas ??
thanks |
early p/g
adjust the linkage from the carb to the trans throttle pressure give it a little less
|
The only way i can adjust it it at the tranny, on the 235 there is no adjustment on the rods, , i would have to remove the rod at the tranny and do ilt there,, i can do though,, i just dont know weather to go clockwize or counter clock wize, ,i am thinking clockwize, because when i am giving it the gas, i can ease up on the gas and make it change,,,, giving it the gas is counter clockwize, ??
Thanks |
| All times are GMT -6. The time now is 11:35 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0 PL2
Copyright Hotrodders.com 1999 - 2012. All Rights Reserved.