|
The water on the floor does help to keep dust down and will usually raise the humidy level making the paint dry faster, I see a major change in the winter months with my heated floor when it's wet. I'd let the singlestage cure overnight at a minimum before masking on it. Shoot the first color where it needs to be and let set overnight in good temperature 65+, mask for the second color and wetsand any dryspray/overspray off before applying the next color (I'm assuming your first application of paint will not be covering the entire car).
|