Hot Rod Forum : Hotrodders Bulletin Board - View Single Post - 200-4R Build Finally Begins!
View Single Post
  #56 (permalink)  
Old 11-03-2012, 10:21 AM
TexasT's Avatar
TexasT TexasT is offline
Did you ever wonder?
 

Last journal entry: Got it moving under its own power
Last photo:
Join Date: May 2003
Location: Texas
Posts: 150
Wiki Edits: 0

Thanks: 1
Thanked 10 Times in 10 Posts
Quote:
from matt69cutlass at oldspwoer.com

Re: Drilling 200-R front drain
Remove the pump, disassemble and remove front bushing and seal. Take a 5/16 and enlarge the drainback hole, take the drill and slightly "wiggle" the drill to elongate the drain hole. Flip the pump over and drill the intersecting drain hole to match the front. Once this is all done install a new bushing, making sure it doesn't cover the drain hole (now you see the reason for elongating the hole) and install a new seal. A seal retainer from a late model 4L60/4L60E would be a wise addition.
Thought this of interest.

also, this. Kinda long but it has a bunch of part numbers and such. I signed up for the mailing list but was unable to find his posts on the build from he77. Maybe someone else has a link.

The Monte Carlo Mailing List: Tech Articles
Reply With Quote