okay thanks for the info, for the fuel line are you talking about something like this
just want to make sure we are all talking about the same thing here, and for eveyone that said run the vent line to the frame, doesnt it need to be above the fill cap? and since the fill cap is going to be in the bed it would have to be higher than that i think, right?