Hot Rod Forum : Hotrodders Bulletin Board - View Single Post - Curing Concrete.
View Single Post
  #4 (permalink)  
Old 08-14-2003, 02:30 PM
willys36@aol.com's Avatar
willys36@aol.com willys36@aol.com is offline
Hotrodders.com Moderator
 
Last wiki edit: How to rebuild a Rochester Quadrajet 4MV carbureto...
Last journal entry: How to change auto shift timing on 200R4
Last photo:
Join Date: May 2002
Location: Bakersfield
Posts: 8,388
Wiki Edits: 21

Thanks: 1
Thanked 4 Times in 4 Posts
A week would be plenty. The 28 day number comes from the fact that concrete reaches its maximum strengh in that time. It is the spec for critical structures like bridges, & buildings. For a parking slab, especially one that is 6" thick - normal is 4", adequate strength is reached in a couple of days.
Reply With Quote