Quote:
|
Originally Posted by gator412
I was just trying to educate myself in what options I have here. As I stated I need 200 amp service in the building. I am going to have a licensed electrician do the work. My main question was can I get 200 amps single phase out of 150 amp three phase. So don't worry guys I won't do the work (I am a sheet metal worker not an electrician) and I hope that anyone doing any electrical work would get a licensed electrician to do it. Thanks, Gator
|
the service conductors of your 150a 3phase panel is prob not big enough 4 a 200a single phase panel, unless the wire was over sized. and if it was over sized, it was prob because of voltage drop or ambient tempaure or some reason, so it prob still isn't big enough big enough service feeder .
kinda guessing on wire size.........