Hot Rod Forum : Hotrodders Bulletin Board - View Single Post - Projects for 2012
View Single Post
  #24 (permalink)  
Old 01-25-2012, 12:43 AM
Dave57210 Dave57210 is offline
Semper Gumby
 
Last photo:
Join Date: Feb 2007
Location: Vancouver, BC
Posts: 335
Wiki Edits: 2

Thanks: 160
Thanked 192 Times in 155 Posts
2012 Project

Finish my shop. This involves
1)clearing out/cleaning up
2) finish interior wall insulation and cladding
3) install ceiling insulation and ceiling (with lights)
4) install the two 4-post hoists
5) install the compressor and airlines
6) install the boiler for the hydronic heating

THEN- set priority for which car gets attention first, and arrange shop accordingly
Reply With Quote