Hot Rod Forum : Hotrodders Bulletin Board - View Single Post - Spray booth pit preference?
View Single Post
  #7 (permalink)  
Old 03-18-2013, 04:55 PM
Old Fool's Avatar
Old Fool Old Fool is offline
Registered User
 
Last photo:
Join Date: Jan 2008
Location: spokane,wa.
Posts: 1,347
Wiki Edits: 0

Thanks: 8
Thanked 40 Times in 34 Posts
Ray, I appreciate the help
IF i were to do the 6 ft wide pit, I would use sheet metal screwed to the supporting legs holding the center 2 feet of floor up, there would be a 2' seperation of the legs of the H.

My pit is 36" deep from top of floor of pit to top of floor of booth.
Reply With Quote