Hot Rod Forum : Hotrodders Bulletin Board - View Single Post - Time frame to clear coat
View Single Post
  #6 (permalink)  
Old 09-23-2005, 10:17 PM
Centerline Centerline is offline
Registered User
 
Last wiki edit: Mopar tapered axle rear brake conversion
Last journal entry: What I'm doing now...
Last photo:
Join Date: Jan 2002
Posts: 4,267
Wiki Edits: 49

Thanks: 0
Thanked 5 Times in 5 Posts
Quote:
Originally Posted by MrMopar
I have already got the sheet on the paint, one of the first things I did when this came up. All it says is... "Allow base coat to setup for 15 minutes prior to clear coating. Longer dry time may be required depending on shop conditions and the number of coats applied." No where does it say "...but no longer than..." or something to that effect.

I do have some base left if needed but it'll be very close on even getting a lite once over.

Thanks

Alan
You're right. Those "P" sheets leave a lot to be desired. Given the lack of info a good rule of thumb is to clear base within 24 hours but if possible I'd check with your supplier to make sure.
Reply With Quote