Hot Rod Forum : Hotrodders Bulletin Board - View Single Post - The "What Did You Work On Today" thread
View Single Post
  #855 (permalink)  
Old 04-14-2012, 01:09 PM
MARTINSR's Avatar
MARTINSR MARTINSR is offline
Brian Martin,Freelance adviser
 
Last photo:
Join Date: Jun 2004
Location: San francisco bay area
Age: 55
Posts: 13,228
Wiki Edits: 0

Thanks: 1,350
Thanked 1,184 Times in 1,044 Posts
Quote:
Originally Posted by Irelands child
Brian - something from the nanny country which might be an interesting read for those that have 'cold hands' (and not what your other half complains about either). I know my hands get cold, but nowhere near what this says.

And what I'm working on - working on the tiling in the master bathroom, then off to a neighbor's 50th anniversary get together.

That tile job has become a large boulder hanging over my head - it's only a 7' long by 2' wide counter top and wrap around back splash, but my wife chose 3/8" thick x13.5x13.5 porcelain tile which is a bear to cut (already wiped out one blade). Then when that's done, need to spray the vanity drawers and repaint the rest of the room plus install new moldings. A 2 week project that's well into 2 MONTHS. Glad we have 2 bath rooms

Dave W
I fully remodeled my ONLY bathroom complete down to the floor joists a few years ago. Oh yeah that was a challenge!

Brian
Reply With Quote