Part 2: Initial Frame Work
TurboS10


As you can see below, the first thing was to cut the rear frame section out of the way to make room for the new Competition Engineering frame rails and 4 link. The roll cage was one I got from Jegs. After several long weekends and A LOT of measuring I had the new frame and cage in place.

Chevy S10 Truck Project

Chevy S10 Truck Project



Click here for Part 3: Rearend and Brakes