The inner fender panels needed to be notched again to clear the tabs and hoses. A few more steps and the inner panels will be ready for the final rebuild of the upper a-frame cut outs.
The combi valve and bracket were installed. Then the lines for the front brakes were fabbed.
I ran out of time so the rears are not started. The master cylinder to combi valve lines also need fabricated. The brake lines should be done by this time next week.