The shop i work at has a single lift, and one side of the lift was bolted to a patch of concrete that caped an old oil change pit. Turned out that that concrete was NOT suitable for bolting a lift to.
Last week the concrete there gave out, and to repair it we broke out a 3 x 4 section of the old concrete, compacted everything below, and poured a foot thick pad.
Yea ... 12+ inches of 5000psi concrete.
So now we've been told that we need to wait a full 4 weeks before we bolt the lift back down and use it again.
Is this correct or can we knock a week or so off that ?
Last week the concrete there gave out, and to repair it we broke out a 3 x 4 section of the old concrete, compacted everything below, and poured a foot thick pad.
Yea ... 12+ inches of 5000psi concrete.
So now we've been told that we need to wait a full 4 weeks before we bolt the lift back down and use it again.
Is this correct or can we knock a week or so off that ?